尊龙凯时人生就是搏

LONGi South Korea 800KW Distributed PV Project

尊龙凯时 - 人生就是搏!

Project Overview

  • Project Type
    Industrial and commercial DG
    Project Location
    CHAMSOOT, Gimcheon, South Korea
  • Project Capacity
    800KW
    Product Type
    HI-MO 4
  • Grid-connection Time
    November 2020

Project Highlights

The project is located in the Daedeok area of Gimcheon City, South Korea, in a conventional terrestrial environment. The completion of this photovoltaic power station has changed the energy structure of the small village, and also brought new energy benefits to the government, from a single thermal power generation into the ranks of clean energy power.

网站地图